Start Campus Sines Data Campus
Start Campus Sines Data Campus is an operational data center that is still expanding, operated by Nscale in Sines, Portugal. Its power is about 40 MW, growing to about 280 MW by 2027-09. Epoch AI estimates about 32,000 H100-equivalent AI chips (B300).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Nscale |
| Users | Microsoft |
| Facility power | 40 MW Reported (Epoch AI or owner data) |
| IT power | 33 MW |
| Planned power | 280 MW by 2027-09-30 Epoch AI timeline projection. |
| AI compute | 32,000 H100-equivalents → 541,000 planned |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 1.3 billion → 8.8 billion planned Epoch AI estimate, 2025 USD. |
| Address | Start Campus - Sustainable Data Center Services, Sines, Portugal |
| Coordinates | 37.95655, -8.86896 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-01-01 | 0 | 0 | Land clearing begins for Building 1 (SIN01) |
| 2024-10-31 | 0 | 0 | Building 1 (SIN01) is completed, but at this point it likely not being used for AI as the collaboration with Microsoft that resulted in GB300s did not occur until Q1 2026. The completion is based both on satellite imagery, which shows the building fully completed, and a [March 2025 article](https://econews.pt/2025/03/24/start-campus-to-start-construction-of-second-data-centre-building-in-sines-by-end-june/) that says it "has been in operation since October", which is October of 2024. |
| 2026-04-03 | 40 MW | 32,000 | Building 1 (SIN01) operational for AI, with the first deployment of 12,600 Nvidia GB300 NVL72s to the site being reported completed "Q1 2026" based on the [corporate announcement](https://lp.startcampus.pt/start-campus-hosts-eus-first-nvidia-gb300-chips-with-nscale-for-microsoft). Land clearing also begins for Building 2 (SIN02), with faint dirt outlines for roads and building foundations visible. |
| 2026-08-16 | 40 MW | 32,000 | Satellite imagery shows two black outlines, suggesting two buildings going up on a second adjacent site. There is an outline of another building as well. Further to the east, there is land clearing. |
| 2027-09-30 (projected) | 280 MW | 541,000 | Building 2 (SIN02) projected to be operational. This is based on the timeline provided in the [factsheet](https://23712035.hs-sites.com/hubfs/SINES_02.PDF.pdf?hsCtaAttrib=199407154715) for the site. We expect VR200 GPUs to be used as a lot of those chips will have already been available in September 2027, and the "up to 600kW racks" in the factsheet suggest they are aiming for this. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-04-03 | B300 | 12,600 | Reported |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Start Campus Sines Data Campus use?
Public data puts the facility power at about 40 MW, with about 280 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Start Campus Sines Data Campus use?
Reported chips: B300.
Who operates Start Campus Sines Data Campus?
Nscale. Reported users: Microsoft.
Data centers near Sines
- Start Campus 5.4 km · 16 MW
- MEO data center in Aljustrel 67.1 km
More Nscale data centers
- Microsoft Narvik Norway Norway
- Nscale Keflavik Iceland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.