Start Campus
Start Campus is an operational data center in Sines, Portugal. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 6.2 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 129,429 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Start SIN01 |
| Coordinates | 37.93505, -8.81341 |
| Website | startcampus.pt/en |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Start Campus use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Data centers near Sines
- Start Campus SIN01 188 m
- Start Campus Sines Data Campus 5.4 km · 40 MW
- Start Campus SIN02 5.9 km
- EllaLink Sines Vasco de Gama CLS 6.8 km
- MEO data center in Aljustrel 62.8 km