Nscale Keflavik
Nscale Keflavik is an operational data center that is still expanding, operated by Nscale in Reykjanesbær, Iceland. Its power is about 6.6 MW, growing to about 13 MW by 2026-12. Epoch AI estimates about 5,821 H100-equivalent AI chips (B300).
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Nscale |
| Facility power | 6.6 MW Reported (Epoch AI or owner data) |
| IT power | 5.1 MW |
| Planned power | 13 MW by 2026-12-31 Epoch AI timeline projection. |
| AI compute | 5,821 H100-equivalents → 12,000 planned |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 0.2 billion → 0.4 billion planned Epoch AI estimate, 2025 USD. |
| Also known as | Verne Global Campus · Verne Gagnaver |
| Address | Valhallarbraut 868, 262 Reykjanesbær, Iceland |
| Opened | 1955 |
| Coordinates | 63.97699, -22.57548 |
| Website | verneglobal.com |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2022-07-08 | 0 | 0 | Site preparation begins for the southernmost KEF301 data center, here labeled as Building 1. [Heilbrigðiseftirlit Suðurnesja](https://hes.is/mengunareftirlit/leyfisveitingar-mengunareftirlit/starfsleyfi-i-auglysingu/page/2/) records authorization for Mannverk to demolish the existing structure at Valhallarbraut 872, the parcel later identified as KEF301. |
| 2023-05-01 | 0 | 0 | Construction of Building 1 begins. [Reykjanesbær planning records](https://www.reykjanesbaer.is/static/files/Fundargerdir/umhverfis_skipulagsrad/2023/315/12.-2023.05.11-bref-til-skipulagsfulltrua-vegna-kef020.pdf) from May 11 explicitly state that the next construction phase of KEF301 was under construction by May 2023, so we model it as starting by the beginning of the month as a conservative estimate. |
| 2026-01-23 | 0 | 0 | Nscale's GPU fit-out begins at the datacenter owned by Verne in Keflavik, Iceland. Estimated from [Verne's statement](https://www.linkedin.com/posts/verne-dc_phase-1-complete-in-just-three-months-75mw-activity-7452982122384027648-bxbA) that the first 7.5 MW deployment was completed in approximately three months; the exact start date was not disclosed. |
| 2026-04-23 | 6.6 MW | 5,821 | First Nscale AI capacity operational. [Verne reports](https://www.linkedin.com/posts/verne-dc_phase-1-complete-in-just-three-months-75mw-activity-7452982122384027648-bxbA) the first 7.5 MW of Nscale capacity deployed with 128 racks, including 64 liquid-cooled NVIDIA GB300 racks. The AI capacity is assumed to be in the southernmost white building because it is the newest major data hall, has roughly 16 MW of capacity, and was the hall still being expanded most recently before Nscale's deployment; however, Verne and Nscale have not publicly confirmed the building assignment. [Digital 9](https://www.d9infrastructure.com/wp-content/uploads/2023/03/Digital-9-Infrastructure-Capital-Markets-Day-Presentation-March-2023.pdf) [Reykjanesbær](https://www.reykjanesbaer.is/static/files/Fundargerdir/umhverfis_skipulagsrad/2023/315/12.-2023.05.11-bref-til-skipulagsfulltrua-vegna-kef020.pdf) |
| 2026-06-30 | 6.6 MW | 5,821 | 64-rack NVIDIA GB300 NVL72 cluster confirmed in production. [Nscale reports](https://www.nscale.com/blog/nscale-achieves-nvidia-exemplar-cloud-status-on-nvidia-gb300-nvl72) that production benchmarking was performed during June across all 64 racks. Month-end is used because the exact benchmark date was not disclosed. |
| 2026-07-27 | 6.6 MW | 5,821 | Building 1 is operational (estimate). Full campus visibly externally complete from satellite imagery. Virtually no active construction visible. |
| 2026-12-31 (projected) | 13 MW | 12,000 | Full 15 MW AI deployment projected operational. [Nscale and Verne announced](https://www.nscale.com/press-releases/nscale-and-verne) a 15 MW deployment across Verne's Iceland campus during 2026. We're modeling the end of the year as the completion date based on this announcement and the progress visible. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-04-23 | B300 | 2,304 | Estimate |
| 2026-12-31 | B300 | 4,608 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Nscale Keflavik use?
Public data puts the facility power at about 6.6 MW, with about 13 MW planned by 2026. Reported (Epoch AI or owner data).
What chips does Nscale Keflavik use?
Reported chips: B300.
Who operates Nscale Keflavik?
Nscale.
Data centers near Reykjanesbær
- Verne Gagnaver 97 m · 11 MW
- Þjóðbraut 838 409 m · 1.4 MW
- Verne Iceland 681 m
- Opera Iceland KEF-1 SuperPOD 2.3 km · 0.4 MW
- ICE02 Campus 2.3 km · 8.3 MW
- Fitjar Campus 2.6 km · 1.1 MW
- DataCell Keflavik 1 3.1 km
More Nscale data centers
- Start Campus Sines Data Campus Portugal
- Microsoft Narvik Norway Norway
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.