Microtronix Datacenter Ottoville
Microtronix Datacenter Ottoville is an operational data center operated by Microtronix ESolutions in Ottoville, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Microtronix ESolutions |
| Networks | 2 networks PeeringDB. |
| Address | 349 Wayne St |
| Coordinates | 40.92955, -84.34192 |
| Website | microtronixdc.com/products/colocation |
Power and grid
| Utility | Midwest Electric, INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 1.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Microtronix Datacenter Ottoville?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Who operates Microtronix Datacenter Ottoville?
Microtronix ESolutions.
Data centers near Ottoville
- Meta Bowling Green 76.1 km
- Meta Bowling Green Data Center 83.7 km · 236 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.