Nebius Mantsala
Nebius Mantsala is an operational data center that is still expanding, operated by Nebius in Mäntsälä, Finland. Its power is about 90 MW, growing to about 196 MW by 2027-12. Epoch AI estimates about 49,000 H100-equivalent AI chips (H100, B300, H200).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Nebius |
| Users | Microsoft (speculative) |
| Facility power | 90 MW Reported (Epoch AI or owner data) |
| IT power | 75 MW |
| Planned power | 196 MW by 2027-12-31 Epoch AI timeline projection. |
| AI compute | 49,000 H100-equivalents → 226,000 planned |
| AI chips | H100, B300, H200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 42,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.8 billion → 5.5 billion planned Epoch AI estimate, 2025 USD. |
| Coordinates | 60.63534, 25.31593 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-10-08 | 48 MW | 25,000 | [Nebius announces expansion of Mantsala campus to 75MW.](https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw) |
| 2025-11-14 | 48 MW | 25,000 | Satellite imagery suggests that installation of the cooling units is finalizing on the expansion building. Construction equipment remains around the site. We do not believe the building is operational at this point. |
| 2026-03-31 | 90 MW | 49,000 | [Nebius announces that the expansion to 75MW is operational at the beginning of 2026.](https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland) |
| 2026-06-29 | 90 MW | 49,000 | All three buildings in the first phase are operational. |
| 2027-12-31 (projected) | 196 MW | 226,000 | [According to company estimates, the second expansion of 70MW will be complete by the end of 2027.](https://www.linkedin.com/posts/at-earnings-we-said-nebius-is-expanding-its-share-7493603318020370433-hkGo/?utm_source=share&utm_medium=member_ios&rcm=ACoAAAA0mUUBRa3Pv7LQtyPOfMvNdkHncgpQUmc) |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-10-08 | H100 | 25,284 | Estimate |
| 2026-03-31 | B300 | 864 | Estimate |
| 2026-03-31 | H200 | 21,061 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Nebius Mantsala use?
Public data puts the facility power at about 90 MW, with about 196 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Nebius Mantsala use?
Reported chips: H100, B300, H200.
Who operates Nebius Mantsala?
Nebius. Reported users: Microsoft.
Data centers near Mäntsälä
- Global DC OY 2.9 km · 4 MW
- Nebius 8k Finland 2.9 km · 11 MW
- Hetzner data center - HEL1 36.1 km · 18 MW
- Hetzner Online HEL1 (Helsinki) 36.3 km
- Verne Helsinki 38.7 km · 15 MW
- Equinix HE4 - Helsinki, Hansa 46.9 km
- Equinix HE5 - Helsinki, Viikinmäki 49.6 km · 5.9 MW
- Mediam Helsinki Datacenter 52.3 km
More Nebius data centers
- Microsoft-Nebius New Jersey United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.