HSW-DC1RH
HSW-DC1RH is an operational data center operated by High Speed Web in Rock Hill, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | High Speed Web |
| Networks | 2 networks PeeringDB. |
| Address | 420 Dave Lyle Blvd. |
| Coordinates | 34.92958, -81.02184 |
| Website | highspeedweb.net |
Power and grid
| Utility | City Of Rock Hill (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | DUK |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 5.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 288 g CO₂ per kWh (South Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3% |
| Industrial power price | USD 0.079 per kWh (South Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,068 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.47 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | Medium - High (20-40%) (South Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for HSW-DC1RH?
The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.
Who operates HSW-DC1RH?
High Speed Web.
Data centers near Rock Hill
- QTS Charlotte (CTL1) 14.0 km
- Flexential - Charlotte/South (CLT1/2/3) 24.2 km · 13 MW
- Spectrum Charlotte National Data Center 25.6 km · 15 MW
- ScaleMatrix Charlotte Data Center US-East 01 28.4 km · 13 MW
- Carolina Internet / CaroNet 28.5 km
- Carolina Internet / CaroNet XB 28.9 km
- Level(3) Charlotte 29.0 km
- DC74-CLT4 29.2 km · 1.6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.