Data Center Directory

DC74-CLT4

DC74-CLT4 is an operational data center operated by DC74 Data Centers in Charlotte, United States. Our footprint estimate of its power is about 1.6 MW.

Key facts

StatusOperational
OperatorDC74 Data Centers
Facility power1.6 MW (range 0.8 MW to 2.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,334 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 680 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asSEGRA
Address1612 Cross Beam Dr.
Coordinates35.18008, -80.92639
Websitedc74.com

Satellite view

Questions

How much power does DC74-CLT4 use?

We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.

Who operates DC74-CLT4?

DC74 Data Centers.

Data centers near Charlotte

More DC74 Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.