DC74-CLT4 is an operational data center operated by DC74 Data Centers in Charlotte, United States. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DC74 Data Centers |
| Facility power | 1.6 MW (range 0.8 MW to 2.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,334 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | SEGRA |
| Address | 1612 Cross Beam Dr. |
| Coordinates | 35.18008, -80.92639 |
| Website | dc74.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DC74-CLT4 use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
Who operates DC74-CLT4?
DC74 Data Centers.
Data centers near Charlotte
- Level(3) Charlotte 221 m
- Carolina Internet / CaroNet XB 548 m
- Carolina Internet / CaroNet 752 m
- ScaleMatrix Charlotte Data Center US-East 01 788 m · 13 MW
- DC74-CLT1 1.8 km
- CLT2 1.9 km
- Spectrum Charlotte National Data Center 4.2 km · 15 MW
- Flexential - Charlotte/South (CLT1/2/3) 5.1 km · 13 MW
More DC74 Data Centers data centers
- DC74-CLT1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.