HCE Telecom, Hamilton
HCE Telecom, Hamilton is an operational data center operated by Hamilton Community Enterprises in Hamilton, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Hamilton Community Enterprises |
| Address | 79 Bay Street North |
| Coordinates | 43.26069, -79.87323 |
| Website | hcetelecom.com |
Power and grid
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 8.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.3 °C (2001 to 2025) |
| Cooling degree days | 339 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for HCE Telecom, Hamilton?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates HCE Telecom, Hamilton?
Hamilton Community Enterprises.
Data centers near Hamilton
- NetAccess Hamilton HAM02 514 m
- Halton Datacenter - Milton1 31.4 km
- Ministry of Government Services Data Centre 35.9 km · 39 MW
- RBC Guelph Data Centre 37.7 km · 41 MW
- Cyxtera Toronto YYZ1 38.4 km · 12 MW
- Centersquare Toronto (YYZ1) 38.4 km
- 11:11 Systems 38.8 km · 6.7 MW
- CGI 39.2 km · 3.5 MW