CGI
CGI is an operational data center in Mississauga, Canada. Our footprint estimate of its power is about 3.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.5 MW (range 1.7 MW to 5.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,891 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Century Avenue 6820 |
| Coordinates | 43.60132, -79.74629 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CGI use?
We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.
Data centers near Mississauga
- 11:11 Systems 461 m · 6.7 MW
- Maxxam Analytics International Inc. 634 m · 19 MW
- 11:11 Systems 906 m · 9.1 MW
- Cyxtera Toronto YYZ1 937 m · 12 MW
- Centersquare Toronto (YYZ1) 950 m
- CentriLogic Traders (TRA) 6.8 km
- Cogent Mississauga 2 8.8 km
- CentriLogic Mississauga (MIS) 8.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.