11:11 Systems
11:11 Systems is an operational data center in Mississauga, Canada. Our footprint estimate of its power is about 6.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.7 MW (range 3.3 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,552 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Argentia Road 2330, Mississauga |
| Coordinates | 43.59825, -79.75013 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 11:11 Systems use?
We estimate the facility power at about 6.7 MW. Estimate from building footprint, low confidence.
Data centers near Mississauga
- CGI 461 m · 3.5 MW
- Cyxtera Toronto YYZ1 481 m · 12 MW
- Centersquare Toronto (YYZ1) 489 m
- Maxxam Analytics International Inc. 1.1 km · 19 MW
- 11:11 Systems 1.3 km · 9.1 MW
- CentriLogic Traders (TRA) 7.3 km
- Cogent Mississauga 2 9.0 km
- CentriLogic Mississauga (MIS) 9.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.