Data Center Directory

Flexential - Charlotte/North (CLT4/5)

Flexential - Charlotte/North (CLT4/5) is an operational data center operated by Flexential in Charlotte, United States. Our footprint estimate of its power is about 6.7 MW.

Key facts

StatusOperational
OperatorFlexential
Facility power6.7 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,615 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks5 networks, 2 internet exchanges
PeeringDB.
Also known asFlexential Charlotte - North
Address10105 David Taylor Dr
Coordinates35.32967, -80.76602
Websiteflexential.com

Satellite view

Questions

How much power does Flexential - Charlotte/North (CLT4/5) use?

We estimate the facility power at about 6.7 MW. Estimate from building footprint, low confidence.

Who operates Flexential - Charlotte/North (CLT4/5)?

Flexential.

Data centers near Charlotte

More Flexential data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.