Data Center Directory

Equinix SY6 - Sydney (formerly Metronode Sydney 2)

Equinix SY6 - Sydney (formerly Metronode Sydney 2) is an operational data center operated by Equinix in Silverwater, Australia. Our footprint estimate of its power is about 2 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power2 MW (range 0.8 MW to 5.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,005 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 850 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks16 networks, 3 internet exchanges
PeeringDB.
Also known asEquinix SY6
Address8-14 Egerton St
Coordinates-33.83668, 151.05328
Websiteequinix.com/locations/asia-colocation/australia-colocation/sydney-data-centers/sy6

Satellite view

Questions

How much power does Equinix SY6 - Sydney (formerly Metronode Sydney 2) use?

We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.

Who operates Equinix SY6 - Sydney (formerly Metronode Sydney 2)?

Equinix.

Data centers near Silverwater

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.