DXN Data Centre
DXN Data Centre is an operational data center in Concord West, Australia. Our footprint estimate of its power is about 7.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.4 MW (range 3.7 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,138 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Parkview Drive 5 |
| Coordinates | -33.84521, 151.07365 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DXN Data Centre use?
We estimate the facility power at about 7.4 MW. Estimate from building footprint, low confidence.
Data centers near Concord West
- Fujitsu Homebush/Sydney Olympic Park 538 m · 8.1 MW
- TPG Telecom data center in Newington 2.0 km · 6.4 MW
- Equinix SY6 - Sydney (formerly Metronode Sydney 2) 2.1 km · 2 MW
- Equinix SY9x 4.3 km · 11 MW
- AirTrunk Sydney North 7.8 km · 26 MW
- NEXTDC S2 8.2 km · 7.8 MW
- Fujitsu North Ryde 8.4 km · 14 MW
- NEXTDC S1 8.5 km · 34 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.