Element Critical Austin AUS1 is an operational data center operated by Element Critical in Austin, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Element Critical |
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,233 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | Element Critical |
| Address | 8025 North Interstate Highway 35 |
| Coordinates | 30.34210, -97.69630 |
| Website | elementcritical.com/data-centers/austin-one |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Element Critical Austin AUS1 use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Who operates Element Critical Austin AUS1?
Element Critical.
Data centers near Austin
- Level(3) Austin (Kramer) 4.9 km
- TACC Lonestar6 5.9 km · 0.5 MW
- 1011 San Jacinto 8.8 km
- BESTNAP 8.8 km
- Alpheus Austin (1905 E. 6th Street) 9.3 km · 4.9 MW
- Lumen Austin 3 9.3 km · 0.8 MW
- Dell Rattler 9.4 km · 0.2 MW
- DataBank Austin (AUS1) 12.3 km
More Element Critical data centers
- Element Critical Chicago CH1 United States
- Element Critical Northern Virginia VA1 United States
- Element Critical Chicago CH2 United States
- Element Critical Houston HOU1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.