Data Center Directory

Element Critical Austin AUS1

Element Critical Austin AUS1 is an operational data center operated by Element Critical in Austin, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorElement Critical
Facility power11 MW (range 5.5 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,233 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks, 1 internet exchanges
PeeringDB.
Also known asElement Critical
Address8025 North Interstate Highway 35
Coordinates30.34210, -97.69630
Websiteelementcritical.com/data-centers/austin-one

Satellite view

Questions

How much power does Element Critical Austin AUS1 use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

Who operates Element Critical Austin AUS1?

Element Critical.

Data centers near Austin

More Element Critical data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.