Digital Edge OSA2

Digital Edge OSA2 is an operational data center operated by Digital Edge DC in Kobe, Japan. Our footprint estimate of its power is about 5.9 MW.

Key facts

StatusOperational
OperatorDigital Edge DC
Facility power5.9 MW (range 3 MW to 9.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,956 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks, 1 internet exchanges
PeeringDB.
Also known asCTC Kobe
Address8 Chome-2-1 Kanokodai Kitamachi, Kita Ward
Coordinates34.86408, 135.21442
Websitedigitaledgedc.com/products/datacenters/japan#osa2

Satellite view

Questions

How much power does Digital Edge OSA2 use?

We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.

Who operates Digital Edge OSA2?

Digital Edge DC.