NEC神戸システムセンター
NEC神戸システムセンター is an operational data center in Akashi, Japan. Our footprint estimate of its power is about 7.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.6 MW (range 3 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 62,922 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 34.72407, 135.01733 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NEC神戸システムセンター use?
We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.
Data centers near Akashi
- NTT 17.0 km
- スーパーコンピュータ「富岳」 20.2 km
- Digital Edge OSA2 23.8 km · 5.9 MW
- netXDC 24.3 km
- NTT DATA Dojima (building #4) 43.4 km
- Equinix OS1 - Osaka 44.0 km
- TIS data center in Osaka 44.2 km
- Osaka University SQUID 44.4 km · 0.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.