Data Center Directory

Digital Edge TYO2 (ComSpace 1) - Tokyo

Digital Edge TYO2 (ComSpace 1) - Tokyo is an operational data center operated by Digital Edge DC in Tokyo, Japan. Our footprint estimate of its power is about 0.8 MW.

Key facts

StatusOperational
OperatorDigital Edge DC
Facility power0.8 MW (range 0.4 MW to 1.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 662 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 340 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks26 networks, 3 internet exchanges
PeeringDB.
Also known asTYO2 Tokyo Data Center
AddressComSpace Bldg.
Coordinates35.68747, 139.77948
Websitedigitaledgedc.com/products/datacenters/japan#tyo2

Satellite view

Questions

How much power does Digital Edge TYO2 (ComSpace 1) - Tokyo use?

We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.

Who operates Digital Edge TYO2 (ComSpace 1) - Tokyo?

Digital Edge DC.

Data centers near Tokyo

More Digital Edge DC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.