野村総合研究所 東京第一DC is an operational data center in Tama, Japan. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,168 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.62808, 139.42015 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 野村総合研究所 東京第一DC use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Data centers near Tama
- Tokyo West 1 2.2 km · 3.8 MW
- Keppel Tokyo Data Centre 1 2.4 km · 42 MW
- Data center in Yabe 2.5 km · 19 MW
- NTT 7.5 km
- NTT 11.0 km · 2.1 MW
- NTT DOCOMO BUSINESS TK8 - Tokyo 13.3 km
- 西東京データセンター 1号棟 14.3 km · 58 MW
- Secure Data Center Bekkan 14.7 km
Sources