西東京データセンター 1号棟 is an operational data center in Nishi-Tokyo-shi, Japan. Our footprint estimate of its power is about 58 MW.

Key facts

StatusOperational
Facility power58 MW (range 29 MW to 93 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,726 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 25,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.