Data Center Directory

Keppel Tokyo Data Centre 1

Keppel Tokyo Data Centre 1 is an operational data center in Yabe, Japan. Our footprint estimate of its power is about 42 MW.

Key facts

StatusOperational
Facility power42 MW (range 21 MW to 67 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,990 m² building outline x 5 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 18,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known as唐木田テクノロジービル
Coordinates35.61327, 139.40040

Satellite view

Questions

How much power does Keppel Tokyo Data Centre 1 use?

We estimate the facility power at about 42 MW. Estimate from building footprint, low confidence.

Data centers near Yabe

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.