DayOne Kempas
DayOne Kempas is an operational AI data center in Johor, Malaysia. Its power is about 590 MW. Epoch AI estimates about 481,000 H100-equivalent AI chips (B300).
Key facts
| Status | Operational |
|---|---|
| Facility power | 590 MW Reported (Epoch AI or owner data) |
| IT power | 422 MW |
| AI compute | 481,000 H100-equivalents |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 230,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 16.0 billion Epoch AI estimate, 2025 USD. |
| Address | HP79+MP, 81300 Johor Bahru, Johor, Malaysia |
| Coordinates | 1.52877, 103.70505 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-11-11 | 0 | 0 | Land clearing begins. |
| 2025-09-15 | 0 | 0 | In this [video](https://www.youtube.com/watch?v=HODHjDbFt10) at 6:28, some fans can be seen in motion for Building 3. However, we think it's unlikely that any buildings are at fully operational capacity yet. Buildings 1-4 are roofed. Building 5-6 shells are underway. |
| 2026-01-22 | 112 MW | 91,000 | Buildings 3 and 4 are operational. This is based on construction looking complete, and DayOne [reporting](https://archive.is/8CFXN) 390 MW "in service" across both Nusajaya and Kempas campuses as of Jan 30. Subtracting our [Nusajaya estimates](https://epoch.ai/data/ai-data-centers/directory/dayone-nusajaya) (69.5 MW excluded in Phase 1 + 240.3 MW AI) implies ~80 MW in service at KTP, consistent with roughly 2 buildings per our ~49.6 MW per-building estimate, but not at full capacity. Buildings 1 and 2 look complete with rooftop cooling equipment installed (32 units each, in 2 strips of 16). The units are almost all single-fan cells; Building 2 has one strip of 16 single-fan cells and one darker bank of 16 long multi-fan air-cooled (slat) units - this suggests an cell-to-air-cooled power equivalence that informs our power estimates. The smaller Building 9 (west of Building 1, half fit-out: 16 cells) also has its cooling installed. Building 5 has rooftop equipment partially installed; Building 6 is roofed; Buildings 7-8 shells are still underway. |
| 2026-06-01 | 313 MW | 254,000 | Buildings 1-4 and the smaller Building 9 assumed fully operational: cooling equipment was installed by Jan 2026 (Building 9 on the same timeline as Building 1) and the implied KTP in-service figure (~80 MW) shows them ramping in early 2026, so we allow ~3 more months to reach full capacity. Rooftop equipment texture is visible campus-wide. |
| 2026-08-10 | 313 MW | 254,000 | Buildings 5-6 look complete and parking lot activity suggests they are nearly operational. Building 7-8 nearing completion with some construction equipment still in their vicinity. |
| 2026-09-01 | 451 MW | 368,000 | Buildings 5-6 assumed operational. These buildings were roofed between Sep and Dec 2025 and equipment fit-out was underway in Jan 2026; applying the default roof-to-operational delay plus ramp time approximates their operability to this date. |
| 2026-10-01 | 590 MW | 481,000 | Buildings 7-8 assumed operational. These buildings were roofed by March 2026 and by August 2026 their cooling and backup power equipment looked complete. With an additional two months of commissioning after August we approximate their operability to this date. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-01-22 | B300 | 36,179 | Estimate |
| 2026-06-01 | B300 | 100,714 | Estimate |
| 2026-09-01 | B300 | 145,475 | Estimate |
| 2026-10-01 | B300 | 190,237 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DayOne Kempas use?
Public data puts the facility power at about 590 MW. Reported (Epoch AI or owner data).
What chips does DayOne Kempas use?
Reported chips: B300.
Data centers near Johor
- 1-Net North Data Center 12.7 km · 34 MW
- Gp3 Data Center 13.1 km
- DayOne Nusajaya 13.2 km · 662 MW
- SIN06 DC 13.8 km · 72 MW
- Microsoft data center in Singapore 13.8 km · 77 MW
- Data center in Woodlands 15.2 km · 1.7 MW
- YTL Johor 19.3 km · 155 MW
- Google Jurong West Data Center 19.7 km · 8.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.