Data Center Directory

DayOne Nusajaya

DayOne Nusajaya is an operational AI data center in Gelang Patah, Malaysia. Its power is about 662 MW. Epoch AI estimates about 584,000 H100-equivalent AI chips (H100, B300).

Key facts

StatusOperational
Facility power662 MW
Reported (Epoch AI or owner data)
IT power473 MW
AI compute584,000 H100-equivalents
AI chipsH100, B300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 260,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 17.9 billion
Epoch AI estimate, 2025 USD.
Coordinates1.45227, 103.61447 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-06-0100Land clearing begins.
2024-12-3170 MW34,000Buildings 1-2 are fully operational. Based on DayOne [reporting](https://web.archive.org/web/20241231165420/https://dayonedc.com/) that 120 MW is in operation in Johor, with [50 MW](https://www.moomoo.com/news/post/41886329/support-ai-computing-deployment-gds-holdings-nusajaya-technology-park-datacenter?level=1&data_ticket=1778269491837872) towards these two buildings. The date is based on the earliest available archived webpage, so this may have happened earlier.
2026-01-22336 MW282,000Buildings 3-6 are operational, based on them looking complete. DayOne [reported](https://archive.is/8CFXN) that 390 MW is "in service" in Johor as of Jan 30. This is across both Nusajaya (including Phase 1, which we don't include here) and Kempas, but Nusajaya is the vast majority of capacity at this time. Building 7 and 8 look almost complete, while Building 9 and 10 shells are still under construction.
2026-04-05336 MW282,000Buildings 7-10 look mostly complete, but there is still some construction work at the edges.
2026-10-02662 MW584,000Buildings 7-10 are operational. Judging by their state in April 2026, we expect 3 months to finish construction and another 3 months to ramp to full capacity.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-12-31H10034,400Estimate
2026-01-22B30097,870Estimate
2026-10-02B300217,467Estimate

Satellite view

Questions

How much power does DayOne Nusajaya use?

Public data puts the facility power at about 662 MW. Reported (Epoch AI or owner data).

What chips does DayOne Nusajaya use?

Reported chips: H100, B300.

Data centers near Gelang Patah

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.