Data Center Directory

Data Center KUL21

Data Center KUL21 is an operational data center in Cyberjaya, Malaysia. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
Facility power13 MW (range 5.3 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 110,539 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates2.89825, 101.65596

Satellite view

Questions

How much power does Data Center KUL21 use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

Data centers near Cyberjaya

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.