Damac Digital, Daria Data Centre KUL01
Damac Digital, Daria Data Centre KUL01 is an operational data center in Cyberjaya, Malaysia. Our footprint estimate of its power is about 6.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.6 MW (range 2.6 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 54,648 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 2.90640, 101.64659 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Damac Digital, Daria Data Centre KUL01 use?
We estimate the facility power at about 6.6 MW. Estimate from building footprint, low confidence.
Data centers near Cyberjaya
- Pi DC Datacenter 187 m · 3.5 MW
- Equinix KL02 Data Center 288 m · 9 MW
- Vantage Data Centers KUL2 Campus 438 m · 23 MW
- STTGDC KUL1 528 m · 0.7 MW
- CJ1 CYBERJAYA 648 m · 0.7 MW
- Bridge Data Centres - MY02-C2 652 m · 13 MW
- Keppel Data Centres | Basis Bay Data Centre 705 m
- Microsoft Datacenter KUL03 792 m · 19 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.