Vantage Data Centers KUL2 Campus
Vantage Data Centers KUL2 Campus is an operational data center operated by Equinix in Cyberjaya, Malaysia. Our footprint estimate of its power is about 23 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 23 MW (range 9.3 MW to 58 MW) Estimate from building footprint, low confidence. Footprint estimate: about 193,097 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 9,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix Data Center - Kuala Lumpur |
| Coordinates | 2.90401, 101.64973 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vantage Data Centers KUL2 Campus use?
We estimate the facility power at about 23 MW. Estimate from building footprint, low confidence.
Who operates Vantage Data Centers KUL2 Campus?
Equinix.
Data centers near Cyberjaya
- CJ1 CYBERJAYA 252 m · 0.7 MW
- STTGDC KUL1 274 m · 0.7 MW
- Keppel Data Centres | Basis Bay Data Centre 371 m
- Damac Digital, Daria Data Centre KUL01 438 m · 6.6 MW
- Microsoft Datacenter KUL03 529 m · 19 MW
- Pi DC Datacenter 595 m · 3.5 MW
- Data Center KUL75 659 m · 14 MW
- Equinix KL02 Data Center 677 m · 9 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States