Data center in Trzebinia is an operational data center in Trzebinia, Poland. Our footprint estimate of its power is about 2.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.8 MW (range 1.4 MW to 4.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 583 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Wiśniowa 7, 32-540, Trzebinia |
| Coordinates | 50.15855, 19.47775 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Trzebinia use?
We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.
Data centers near Trzebinia
- Polcom Alwernia Datacenter 8.8 km · 1.6 MW
- Netia Jaworzno (JAWOH001) 16.8 km
- PLAY Centrum Danych DC2 31.0 km · 1.4 MW
- S-NET KRAKOW DATA CENTER KRDC-1 31.8 km
- Polcom Skawina Datacenter 31.9 km · 3.5 MW
- AGH Cyfronet Helios 32.3 km · 0.5 MW
- WNET DC Krakow 32.4 km
- Connected Krakow 32.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.