Data center in Trzebinia is an operational data center in Trzebinia, Poland. Our footprint estimate of its power is about 2.8 MW.

Key facts

StatusOperational
Facility power2.8 MW (range 1.4 MW to 4.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 583 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWiśniowa 7, 32-540, Trzebinia
Coordinates50.15855, 19.47775

Satellite view

Questions

How much power does Data center in Trzebinia use?

We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.