AGH Cyfronet Helios is an operational AI data center operated by AGH University of Krakow in Kraków, Poland. Its power is about 0.5 MW. Epoch AI estimates about 464 H100-equivalent AI chips (NVIDIA GH200, NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | AGH University of Krakow |
| Facility power | 0.5 MW Reported (Epoch AI or owner data) |
| AI compute | 464 H100-equivalents |
| AI chips | NVIDIA GH200, NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 464 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 230 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Nawojki 11, 30-950 Kraków, Poland |
| Coordinates | 50.06898, 19.90920 |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| AGH Cyfronet Helios | NVIDIA GH200 + NVIDIA H100 SXM5 80GB | 464 | 0.5 MW | 2024-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AGH Cyfronet Helios use?
Public data puts the facility power at about 0.5 MW. Reported (Epoch AI or owner data).
What chips does AGH Cyfronet Helios use?
Reported chips: NVIDIA GH200, NVIDIA H100 SXM5 80GB.
Who operates AGH Cyfronet Helios?
AGH University of Krakow.
Data centers near Kraków
- S-NET KRAKOW DATA CENTER KRDC-1 591 m
- WNET DC Krakow 607 m
- Connected Krakow 664 m
- S-NET KRAKOW DATA CENTER KRDC-2 840 m
- Orange Polska // Kraków 3.4 km
- Netia Data Center SOUL 5.4 km
- AGH Cyfronet Athena 5.6 km · 0.3 MW
- Dabka Data Center 7.9 km
More AGH University of Krakow data centers
- AGH Cyfronet Athena Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.