Data Center Directory

PLAY Centrum Danych DC2

PLAY Centrum Danych DC2 is an operational data center operated by 3S Data Center in Katowice, Poland. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
Operator3S Data Center
Facility power1.4 MW (range 0.7 MW to 2.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,159 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asPLAY Centrum Danych DC1
AddressGospodarcza 12, 40-432, Katowice
Coordinates50.24568, 19.06404

Satellite view

Questions

How much power does PLAY Centrum Danych DC2 use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

Who operates PLAY Centrum Danych DC2?

3S Data Center.

Data centers near Katowice

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.