Data Center Directory

Data center in Neston

Data center in Neston is an operational data center in Neston, United Kingdom. Our footprint estimate of its power is about 3 MW.

Key facts

StatusOperational
Facility power3 MW (range 1.5 MW to 4.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,532 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.41743, -2.21948

Satellite view

Questions

How much power does Data center in Neston use?

We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.

Data centers near Neston

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.