Ark Data Centres
Ark Data Centres is an operational data center operated by Ark Data Centres in Neston, United Kingdom. Our footprint estimate of its power is about 6.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ark Data Centres |
| Facility power | 6.2 MW (range 3.1 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,198 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | SN13 9GB |
| Coordinates | 51.41846, -2.22305 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ark Data Centres use?
We estimate the facility power at about 6.2 MW. Estimate from building footprint, low confidence.
Who operates Ark Data Centres?
Ark Data Centres.
Data centers near Neston
- Data center in Neston 273 m · 3 MW
- Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 513 m · 10 MW
- nLighten Bristol BRS1 28.2 km
- nLighten Bristol 28.3 km · 7.4 MW
- Vodafone 29.9 km · 8.5 MW
- Nationwide Building Society data center in Swindon 31.8 km · 4 MW
- AWS Swindon Data Centre 33.9 km · 14 MW
- nLighten Swindon BRS2 39.8 km · 8 MW
More Ark Data Centres data centers
- Ark Data Centres data center in Fleet United Kingdom
- Ark Data Centres Meridian Park United Kingdom
- Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 United Kingdom
- Ark Data Centres - Longcross Park United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.