Data Center Directory

CyrusOne Sterling V

CyrusOne Sterling V is an operational data center operated by CyrusOne in Sterling, United States. Our footprint estimate of its power is about 10 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power10 MW (range 5.1 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,546 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks, 2 internet exchanges
PeeringDB.
Also known asCyrusOne NVA7
Address21350 Pacific Blvd
Opened2020
Coordinates39.02720, -77.43583
Websitecyrusone.com

Satellite view

Questions

How much power does CyrusOne Sterling V use?

We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne Sterling V?

CyrusOne.

Data centers near Sterling

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.