11:11 Systems
11:11 Systems is an operational data center in Mississauga, Canada. Our footprint estimate of its power is about 9.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.1 MW (range 4.6 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,598 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Argentia Road 1800, Mississauga |
| Coordinates | 43.60332, -79.73538 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 11:11 Systems use?
We estimate the facility power at about 9.1 MW. Estimate from building footprint, low confidence.
Data centers near Mississauga
- Maxxam Analytics International Inc. 538 m · 19 MW
- CGI 906 m · 3.5 MW
- 11:11 Systems 1.3 km · 6.7 MW
- Cyxtera Toronto YYZ1 1.7 km · 12 MW
- Centersquare Toronto (YYZ1) 1.8 km
- CentriLogic Traders (TRA) 6.0 km
- Cogent Mississauga 2 7.9 km
- CentriLogic Mississauga (MIS) 8.0 km