BER11
BER11 is an operational data center operated by Vantage Data Centers in Ludwigsfelde, Germany. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Vantage Data Centers |
| Facility power | 12 MW (range 5.9 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,800 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Uferring 5, 14974, Ludwigsfelde |
| Coordinates | 52.32203, 13.29472 |
| Website | vantage-dc.com/data-center-locations/emea/berlin-i-germany |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does BER11 use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
Who operates BER11?
Vantage Data Centers.
Data centers near Ludwigsfelde
- BER12 169 m · 9.6 MW
- Data center in Ludwigsfelde 182 m · 10 MW
- Webplus24 GmbH 8.6 km
- nLighten Berlin BER1 12.1 km
- Lumen Berlin 13.4 km
- NTT 14.0 km · 13 MW
- NTT Berlin 2 Data Center (BER2) 14.1 km
- Data center in Mariendorf 14.1 km · 3.4 MW
More Vantage Data Centers data centers
- Vantage TX1 United States
- Vantage VA2 United States
- Vantage Data Center FRA21 Germany
- Vantage VA3 United States
- Vantage VA13 United States
- Vantage San Antonio II United States
- Vantage Data Centers - CWL1 United Kingdom
- Vantage Data Centers AZ1 Campus United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.