BER12

BER12 is an operational data center in Ludwigsfelde, Germany. Our footprint estimate of its power is about 9.6 MW.

Key facts

StatusOperational
Facility power9.6 MW (range 4.8 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,002 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressUferring 7, 14974, Ludwigsfelde
Coordinates52.32306, 13.29289

Satellite view

Questions

How much power does BER12 use?

We estimate the facility power at about 9.6 MW. Estimate from building footprint, low confidence.