TYO3 Tokyo Data Center

TYO3 Tokyo Data Center is an operational data center operated by Digital Edge in Tokyo, Japan. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatorDigital Edge
Facility power1.5 MW (range 0.7 MW to 2.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,217 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates35.69784, 139.70576
Websitedigitaledgedc.com/products-services/data-centers/japan/#TYO3

Satellite view

Questions

How much power does TYO3 Tokyo Data Center use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

Who operates TYO3 Tokyo Data Center?

Digital Edge.