VocaLink
VocaLink is an operational data center in Harrogate, United Kingdom. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.8 MW (range 0.9 MW to 2.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,507 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Cardale Park 4, HG3 1RY, Harrogate |
| Coordinates | 53.97581, -1.56900 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does VocaLink use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
Data centers near Harrogate
- Redcentric Harrogate Data Centre 362 m
- DC14-Leeds 18.0 km
- aql DC2 20.4 km
- aql DC5 21.3 km
- GridJet 21.4 km · 1 MW
- Templus DC Leeds LEE01 21.8 km
- Legend Bradford 23.8 km
- Bytemark YO26 DC1 28.7 km