GridJet is an operational data center in Leeds, United Kingdom. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 858 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | The Tristram Centre 4, LS12 6BF, Leeds |
| Coordinates | 53.78308, -1.57346 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GridJet use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
Data centers near Leeds
- Templus DC Leeds LEE01 764 m
- aql DC5 1.9 km
- aql DC2 2.4 km
- DC14-Leeds 9.0 km
- Legend Bradford 12.5 km
- nLighten Leeds LBA1 14.8 km · 5.7 MW
- HSBC Wakefield Data Centre 15.7 km · 17 MW
- Redcentric Elland Data Centre 19.1 km · 14 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.