Virtus LONDON1
Virtus LONDON1 is an operational data center in Enfield, United Kingdom. Our footprint estimate of its power is about 3.7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.7 MW (range 1.8 MW to 5.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,048 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Crown Road 13, EN1 1TX, Enfield |
| Coordinates | 51.65190, -0.05536 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Virtus LONDON1 use?
We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.
Data centers near Enfield
- Ark Data Centres Meridian Park 3.7 km · 11 MW
- Google Datacentre Waltham Cross 4.9 km · 13 MW
- Google Waltham Cross 5.8 km · 124 MW
- Soverign Data Centre - Metro Point 6.6 km · 1.5 MW
- nLighten London STN1 12.5 km
- TATA Communications Stratford 12.8 km
- Verizon UK5 13.8 km · 11 MW
- Stellanor London North 14.0 km · 9.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.