Soverign Data Centre - Metro Point
Soverign Data Centre - Metro Point is an operational data center operated by Sovereign Business Integration in Barnet, United Kingdom. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Sovereign Business Integration |
| Facility power | 1.5 MW (range 0.8 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,253 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Chalk Lane, EN4 9JQ, Barnet |
| Coordinates | 51.65146, -0.15036 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Soverign Data Centre - Metro Point use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
Who operates Soverign Data Centre - Metro Point?
Sovereign Business Integration.
Data centers near Barnet
- Virtus LONDON1 6.6 km · 3.7 MW
- Ark Data Centres Meridian Park 8.3 km · 11 MW
- Google Datacentre Waltham Cross 8.6 km · 13 MW
- Elstree Customer Hosting Centre 8.9 km
- Google Waltham Cross 9.8 km · 124 MW
- LDeX 1 10.8 km · 3.2 MW
- Pure DC London Brent Cross 10.8 km · 18 MW
- LDeX1 10.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.