Data Center Directory

Vantage LHR2

Vantage LHR2 is an operational data center in Harlesden, United Kingdom. Our footprint estimate of its power is about 5.2 MW.

Key facts

StatusOperational
Facility power5.2 MW (range 2.6 MW to 8.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,312 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.53297, -0.25923

Satellite view

Questions

How much power does Vantage LHR2 use?

We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.

Data centers near Harlesden

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.