Vantage JNB11

Vantage JNB11 is an operational data center in Midrand, South Africa. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
Facility power15 MW (range 7.5 MW to 24 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,554 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-26.01858, 28.11759

Satellite view

Questions

How much power does Vantage JNB11 use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.