xneelo JNB1 (Formerly Hetzner SA)
xneelo JNB1 (Formerly Hetzner SA) is an operational data center operated by xneelo (Formerly Hetzner SA) in Centurion, South Africa. Our footprint estimate of its power is about 4.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | xneelo (Formerly Hetzner SA) |
| Facility power | 4.3 MW (range 1.7 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 35,430 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 34 networks, 2 internet exchanges PeeringDB. |
| Also known as | Xneelo Samrand Campus |
| Address | 21 Landmarks Avenue, Samrand |
| Coordinates | -25.92762, 28.14075 |
| Website | xneelo.co.za |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does xneelo JNB1 (Formerly Hetzner SA) use?
We estimate the facility power at about 4.3 MW. Estimate from building footprint, low confidence.
Who operates xneelo JNB1 (Formerly Hetzner SA)?
xneelo (Formerly Hetzner SA).
Data centers near Centurion
- Xneelo data center in Midrand 123 m · 4.2 MW
- Africa Data Centres, Johannesburg JHB2, South Africa 400 m · 12 MW
- NTT Johannesburg 1 Data Center (JOH1) 775 m · 2.5 MW
- NTT Data (MEA) - Johannesburg 1 Data Center (JOH1) 840 m
- Digital Parks Africa 1.1 km · 2.1 MW
- Digital Parks - Samrand 2.7 km
- Vodacom data center in Midrand 5.4 km · 9.9 MW
- BCX data center in Midrand 5.6 km · 1.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.