Tsvetochnaya Data Center
Tsvetochnaya Data Center is an operational data center operated by Selectel in St. Petersburg, Russia. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Selectel |
| Facility power | 13 MW (range 6.4 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,143 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 49 networks, 8 internet exchanges PeeringDB. |
| Also known as | Selectel |
| Address | Tsvetochnaya 19+21 |
| Coordinates | 59.88723, 30.32910 |
| Website | selectel.ru |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tsvetochnaya Data Center use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
Who operates Tsvetochnaya Data Center?
Selectel.
Data centers near St. Petersburg
- TimeWeb DataCenter (SPb) 71 m
- CHTP 1.1 km
- IVC ORW Saint-Petersburg 2.7 km
- RETNNet OV DC 3.2 km
- Comlink Telecom 3.4 km
- РетнНет 3.4 km
- IMAQLIQ Data Center 4.1 km · 212 MW
- Data-Center IMAQLIQ 4.3 km
More Selectel data centers
- Berzarina Data Center Russia
- Селектел "Дубровка" Russia
- Selectel data center in Korolev Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.