Berzarina Data Center is an operational data center operated by Selectel in Moscow, Russia. Our footprint estimate of its power is about 5.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Selectel |
| Facility power | 5.8 MW (range 2.9 MW to 9.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,213 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks PeeringDB. |
| Also known as | Selectel Berzarina |
| Address | Ul. Berzarina 36, str. 3 |
| Coordinates | 55.79065, 37.46650 |
| Website | selectel.ru |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Berzarina Data Center use?
We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.
Who operates Berzarina Data Center?
Selectel.
Data centers near Moscow
- KIAEHOUSE 1.4 km
- Datahouse 4.3 km · 3.9 MW
- Stack.HTH 4.7 km
- Linxdatacenter (Moscow) 5.6 km · 2.9 MW
- MSK-IX 5.6 km
- Moscow M10 8.8 km
- Arelion Moscow MSK/O1 9.2 km
- DataPro Moscow II 10.1 km · 1.8 MW
More Selectel data centers
- Tsvetochnaya Data Center Russia
- Селектел "Дубровка" Russia
- Selectel data center in Korolev Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.