@Tokyo Chuo Center (CC1 & CC2)
@Tokyo Chuo Center (CC1 & CC2) is an operational data center in Toyosu, Japan. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 12 MW (range 5.9 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,897 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 35.64852, 139.79270 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does @Tokyo Chuo Center (CC1 & CC2) use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
Data centers near Toyosu
- AT TOKYO (CC1/CC2) 348 m
- 株式会社アット東京 data center in Toyosu 647 m
- Equinix TY11 - Tokyo 978 m · 38 MW
- Equinix TY3 - Tokyo 1.3 km · 19 MW
- Colt Shiohama 2.4 km
- "Center for Advanced Intelligence Project, RIKEN, RAIDEN" 2.5 km · 0.2 MW
- SoftBank 3.0 km
- NTT DOCOMO BUSINESS TK3 - Tokyo 3.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.