Equinix TY11 - Tokyo
Equinix TY11 - Tokyo is an operational data center operated by Equinix in Tokyo, Japan. Our footprint estimate of its power is about 38 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 38 MW (range 19 MW to 60 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,272 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix Tokyo TY11 |
| Address | 1-2-41 Ariake, Koto-ku |
| Coordinates | 35.63974, 139.79236 |
| Website | equinix.com/locations/asia-colocation/japan-colocation/tokyo-data-centers/ty11 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix TY11 - Tokyo use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
Who operates Equinix TY11 - Tokyo?
Equinix.
Data centers near Tokyo
- AT TOKYO (CC1/CC2) 639 m
- @Tokyo Chuo Center (CC1 & CC2) 978 m · 12 MW
- 株式会社アット東京 data center in Toyosu 1.5 km
- Equinix TY3 - Tokyo 2.1 km · 19 MW
- Colt Shiohama 3.2 km
- SoftBank 3.3 km
- "Center for Advanced Intelligence Project, RIKEN, RAIDEN" 3.4 km · 0.2 MW
- NTT DOCOMO BUSINESS TK3 - Tokyo 4.0 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.