TIER IV
TIER IV is an operational data center operated by TIM in Roma, Italy. Our footprint estimate of its power is about 87 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TIM |
| Facility power | 87 MW (range 44 MW to 139 MW) Estimate from building footprint, low confidence. Footprint estimate: about 72,594 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 37,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Via di Macchia Palocco 223, 00125, Roma |
| Coordinates | 41.76454, 12.34445 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TIER IV use?
We estimate the facility power at about 87 MW. Estimate from building footprint, low confidence.
Who operates TIER IV?
TIM.
Data centers near Roma
- DC Noovle ROMA 328 m
- Fiber 23 3.3 km
- Unidata IDC-GALERIA 4.8 km
- Digital Realty ROM1 - Rome 12.1 km
- Data center Roma Capitale 12.8 km
- Retelit S.p.A. Roma Cornelia 14.3 km
- Cornelia (Rome) 14.4 km
- Lumanex DC1 17.0 km
More TIM data centers
- Centrale TIM Trento Nord Italy
- Noovle Italy
- TIM data center in Voghera Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.