Centrale TIM Trento Nord
Centrale TIM Trento Nord is an operational data center operated by TIM in Trento, Italy. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TIM |
| Facility power | 0.8 MW (range 0.4 MW to 1.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 630 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.08465, 11.11508 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centrale TIM Trento Nord use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
Who operates Centrale TIM Trento Nord?
TIM.
Data centers near Trento
- Retelit S.p.A. Trento 2.6 km
- Intacture 24.0 km
- Bolzano - Infranet AG Datacenter 47.2 km
- Sava di Valerio Francesca & C. SAS 50.1 km
- Set 60.7 km · 0.5 MW
- 4ServiceSolutions 64.4 km
More TIM data centers
- TIER IV Italy
- Noovle Italy
- TIM data center in Voghera Italy
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.