The Chess Building is an operational data center operated by CapitaLand Ascendas REIT in Watford, United Kingdom. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorCapitaLand Ascendas REIT
Facility power17 MW (range 8.6 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,383 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCaxton Way 9-17, WD18 8UA, Watford
Coordinates51.64285, -0.42765
Websitecapitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres/the-chess-building.html

Satellite view

Questions

How much power does The Chess Building use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

Who operates The Chess Building?

CapitaLand Ascendas REIT.

Data centers near Watford

More CapitaLand Ascendas REIT data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.