CapitaLand Ascendas REIT data center in High Wycombe
CapitaLand Ascendas REIT data center in High Wycombe is an operational data center operated by CapitaLand Ascendas REIT in High Wycombe, United Kingdom. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CapitaLand Ascendas REIT |
| Facility power | 3.8 MW (range 1.9 MW to 6.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,181 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Coronation Road, HP12 3TA, High Wycombe |
| Coordinates | 51.61990, -0.77903 |
| Website | capitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres/cressex-businesspark.html |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CapitaLand Ascendas REIT data center in High Wycombe use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
Who operates CapitaLand Ascendas REIT data center in High Wycombe?
CapitaLand Ascendas REIT.
Data centers near High Wycombe
- iomart DC5 Maidenhead 10.8 km · 2.6 MW
- Pulsant Maidenhead SE-2 14.2 km · 1 MW
- Virgin Media O2 Slough 14.4 km · 8.4 MW
- Equinix LD6 - London, Slough 14.4 km · 4.6 MW
- Equinix LD7 - London, Slough 14.5 km · 15 MW
- Iron Mountain Data Center - London (LON-1) 14.5 km · 28 MW
- Equinix LD4 - London, Slough 14.6 km · 11 MW
- CyrusOne London 3 14.8 km · 7 MW
More CapitaLand Ascendas REIT data centers
- The Chess Building United Kingdom